Construction continues on the water tower being installed on the site of the Louisville VA Medical Center Aug. 23, 2024.
Date Taken: | 08.23.2024 |
Date Posted: | 08.28.2024 14:27 |
Photo ID: | 8615184 |
VIRIN: | 240823-A-GI410-1002 |
Resolution: | 3000x2000 |
Size: | 1.17 MB |
Location: | LOUISVILLE, KENTUCKY, US |
Web Views: | 14 |
Downloads: | 1 |
This work, Construction continues at the Louisville VA Medical Center Aug. 23, 2024 [Image 7 of 7], by Michael Maddox, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.