240821-N-FC968-1109
NTAG Golden Gate (August 21, 2024) – On Inspection Day, NCCS Smith led a comprehensive review, ensuring all aspects were meticulously examined. NCC Olson and RS2 Christopher demonstrated exceptional dedication by presenting key documents to the inspector, reflecting the high standards upheld at NTAG Golden Gate. (U.S. Navy photo by Boatswain's Mate 2nd Class Li Zhang)
Date Taken: | 08.20.2024 |
Date Posted: | 08.29.2024 14:05 |
Photo ID: | 8617504 |
VIRIN: | 240821-N-FC968-1109 |
Resolution: | 5382x3592 |
Size: | 7.82 MB |
Location: | CALIFORNIA, US |
Web Views: | 14 |
Downloads: | 1 |
This work, NTAG Golden Gate Successfully Completes NIT [Image 11 of 11], by PO2 Li Zhang, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.