On Tuesday, Sept. 10, construction begins to install culverts to avoid flooding like has been seen after heavy monsoon storms. One culvert is planned closer to the Walker gate and the other will go where the temporary steel plate is currently in place. The work area is approximately a one mile stretch from Highway 95 to near the Walker gate. The speed limit will drop to 15 MPH near the roadwork.
Date Taken: | 09.04.2024 |
Date Posted: | 09.04.2024 13:51 |
Photo ID: | 8623177 |
VIRIN: | 240904-O-WH463-3609 |
Resolution: | 5408x3600 |
Size: | 8.3 MB |
Location: | YUMA PROVING GROUND, ARIZONA, US |
Web Views: | 6 |
Downloads: | 0 |
This work, Keep an eye out for road work on Imperial Dam Road [Image 2 of 2], by Ana Henderson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.