Tree debris being removed at Woonsocket Dam. The USACE Regional Rivers Repair Fleet (R3F) from Great Lakes and Ohio Division, Huntington District, Marietta Repair Station, Marietta, Ohio performed replaced all 16 tainter gate cables with sockets on the Woonsocket Dam in Woonsocket, Connecticut. All 16 cables, eight trunnion bearings, and more than 70 plus grease points were lubricated across the dam. The team also removed tree debris that was under and up against the gates.
Date Taken: | 06.25.2024 |
Date Posted: | 09.10.2024 11:08 |
Photo ID: | 8632309 |
VIRIN: | 240625-A-A1420-1004 |
Resolution: | 4032x3024 |
Size: | 2.95 MB |
Location: | WOONSOCKET, RHODE ISLAND, US |
Web Views: | 16 |
Downloads: | 0 |
This work, Tree debris removal at Woonsocket Dam [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.