Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    USACE, BOR conduct periodic inspection of Gavins Point Dam’s spillway tainter gates [Image 3 of 13]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    USACE, BOR conduct periodic inspection of Gavins Point Dam’s spillway tainter gates

    Matthew Walter, U.S. Army Corps of Engineers, Norfolk District structural engineer, inspects tainter gates at the Gavins Point Dam spillway August 29, 2024. Inspections are conducted every five years to identify any signs of deterioration. (U.S. Army photo by Delanie Stafford)

    IMAGE INFO

    Date Taken: 08.29.2024
    Date Posted: 09.17.2024 14:15
    Photo ID: 8647139
    VIRIN: 240829-A-KS317-1003
    Resolution: 2859x3900
    Size: 2.54 MB
    Location: US

    Web Views: 9
    Downloads: 2

    PUBLIC DOMAIN