A map of the Missouri River at Lexington, Missouri, from before the river was stabilized by the U.S. Army Corps of Engineers hangs in John Skelton's office at the Missouri River Area Office in Napoleon, Missouri.
Date Taken: | 08.01.2024 |
Date Posted: | 09.18.2024 16:21 |
Photo ID: | 8649512 |
VIRIN: | 240801-A-UM139-1001 |
Resolution: | 5184x3456 |
Size: | 3.26 MB |
Location: | US |
Web Views: | 4 |
Downloads: | 1 |
This work, ‘We have the responsibility’: Missouri River fish and wildlife mitigation project a vital undertaking [Image 5 of 5], by Christine Paul, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.