Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    September 2024 construction operations of fiscal year 2022-funded South Barracks Project at Fort McCoy [Image 73 of 73]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    September 2024 construction operations of fiscal year 2022-funded South Barracks Project at Fort McCoy

    The construction area for a new $28.08 million barracks building is shown Sept. 12, 2024, at Fort McCoy, Wis., as progress on the facility continues. The contractor for the project, BlindermanPower (Construction), received the notice to proceed with construction on Sept. 26, 2023, and has 780 calendar days to complete the project. The project requires building a four-story, 60,000-square-foot barracks about to house 400 people. Two other barracks of the same specifications have already been built in the same block at the installation since 2019. Overall, it is part of a big transformation taking place at the 1600 block that includes the building of four barracks — two of which are already done, three brigade headquarters buildings, and two planned transient training officer quarters, according to the Fort McCoy Directorate of Public Works. This project is managed by the Army Corps of Engineers and as of mid-September 2024 the project was 45 percent complete. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

    IMAGE INFO

    Date Taken: 09.12.2024
    Date Posted: 09.19.2024 13:55
    Photo ID: 8651272
    VIRIN: 240912-A-OK556-3542
    Resolution: 4487x2830
    Size: 1.37 MB
    Location: FORT MCCOY, WISCONSIN, US

    Web Views: 6
    Downloads: 0

    PUBLIC DOMAIN