Members of multiple California regulatory agencies visit the site of the cured-in-place pipe (CIPP) lining at Travis Air Force Base, July 15, 2024. The CIPP liner was used to repair the stormwater conveyance system as part of the Union Creek environmental remediation project. (U.S. Air Force photo by Airman 1st Class Robert Nichols)
Date Taken: | 07.17.2024 |
Date Posted: | 09.30.2024 18:30 |
Photo ID: | 8670097 |
VIRIN: | 240717-F-RX751-1060 |
Resolution: | 7360x4912 |
Size: | 11.94 MB |
Location: | TRAVIS AIR FORCE BASE, CALIFORNIA, US |
Web Views: | 9 |
Downloads: | 2 |
This work, Union Creek water treatment project continues [Image 5 of 5], by A1C Robert Nichols, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.