Construction continues on the water tower being installed on the site of the Louisville VA Medical Center Aug. 23, 2024.
Date Taken: | 09.24.2024 |
Date Posted: | 10.04.2024 13:52 |
Photo ID: | 8678717 |
VIRIN: | 240823-A-GI410-1003 |
Resolution: | 3000x2000 |
Size: | 1.41 MB |
Location: | LOUISVILLE, KENTUCKY, US |
Web Views: | 6 |
Downloads: | 1 |
This work, Construction continues at the Louisville VA Medical Center Aug. 23, 2024 [Image 3 of 3], by Michael Maddox, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.