The construction area for a new $28.08 million barracks building is shown Oct. 21, 2024, at Fort McCoy, Wis., as progress on the facility continues. The contractor for the project, BlindermanPower (Construction), received the notice to proceed with construction on Sept. 26, 2023, and has 780 calendar days to complete the project. The project requires building a four-story, 60,000-square-foot barracks about to house 400 people. Two other barracks of the same specifications have already been built in the same block at the installation since 2019. Overall, it is part of a big transformation taking place at the 1600 block that includes the building of four barracks — two of which are already done, three brigade headquarters buildings, and two planned transient training officer quarters, according to the Fort McCoy Directorate of Public Works. This project is managed by the Army Corps of Engineers. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Date Taken: | 10.21.2024 |
Date Posted: | 11.06.2024 02:43 |
Photo ID: | 8717312 |
VIRIN: | 241021-A-OK556-5335 |
Resolution: | 5137x3480 |
Size: | 2.87 MB |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 0 |
Downloads: | 1 |
This work, Fort McCoy’s fiscal year 2022-funded South Barracks Project surpasses 50 percent completion [Image 49 of 49], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.