An overhead view of the Niobrara River bedload sediment collector pilot project near Niobrara, Nebraska Sept. 11, 2024. Engineers from U.S. Army Corps of Engineers, Omaha District and the U.S. Army Engineer Research and Development Center tested a 12-foot bedload sediment collector to determine how much sediment could be captured from the Niobrara River before it reaches the Lewis and Clark Lake delta. (U.S. Army Corps of Engineers photo by Nicholas Harnack)
Date Taken: | 09.11.2024 |
Date Posted: | 11.05.2024 16:14 |
Photo ID: | 8739013 |
VIRIN: | 240911-A-OM117-1001 |
Resolution: | 4000x3000 |
Size: | 6.99 MB |
Location: | US |
Web Views: | 5 |
Downloads: | 2 |
This work, Pilot project tests new technology for collecting sediment from Niobrara River [Image 2 of 2], by Nicholas Harnack, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.