A U.S. Air Force Airman assigned to the 380th Expeditionary Civil Engineering Squadron Tiger Team applies tape to a wall during a dormitory renovation project within the U.S. Central Command area of responsibility, Nov. 18, 2024. The ECES tiger team is leading a multifaceted project uniting civil engineering crafts in structural, electrical, plumbing and heating, ventilation and cooling. (U.S. Air Force photo)
Date Taken: | 11.18.2024 |
Date Posted: | 11.25.2024 02:51 |
Photo ID: | 8769856 |
VIRIN: | 241118-F-LY743-4991 |
Resolution: | 7292x4861 |
Size: | 2.88 MB |
Location: | (UNDISCLOSED LOCATION) |
Web Views: | 2 |
Downloads: | 0 |
This work, 380th ECES Tiger team – dormitory renovation project [Image 8 of 8], by SSgt Zachary Rufus, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.