A multi-agency team of researchers and specialists from the U.S. Army Engineer Research and Development Center, the U.S. Army Corps of Engineers Vicksburg District, the U.S. Environmental Protection Agency and industry collaborator WaterStep prepare the Relief Well Sustainment Deployable Resilient Installation water Purification and treatment System at a test site in Magna Vista, Miss., February 20, 2024. The system was designed to decontaminate relief well infrastructure at dams and levees and addresses biofilm growth within the wells while mitigating costs and safety risks during the cleaning process. (U.S. Army Corps of Engineers photo by Carol C. Coleman)
Date Taken: | 02.20.2024 |
Date Posted: | 11.25.2024 12:44 |
Photo ID: | 8770753 |
VIRIN: | 240220-A-FA501-1001 |
Resolution: | 4910x2806 |
Size: | 3.87 MB |
Location: | VICKBURG, MISSISSIPPI, US |
Web Views: | 7 |
Downloads: | 1 |
This work, ERDC researchers design, test new mobile treatment for relief wells [Image 2 of 2], by Carol Coleman, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.