Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Wilson Lock de-watered for inspection and maintenance [Image 4 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Wilson Lock de-watered for inspection and maintenance

    FLORENCE, ALABAMA, UNITED STATES

    11.24.2024

    Photo by Michael Davis 

    U.S. Army Corps of Engineers, Nashville District

    A view into the de-watered main Wilson Lock chamber from onboard the U.S. Army Corps of Engineers Regional Rivers Repair Fleet (R3F) vessel on Nov. 25, 2024 in Florence, Alabama. The R3F High Capacity Fleet de-watered the lock chamber to allow engineers to thoroughly inspect the lock miter gates and begin critical repairs. (USACE photo by Michael Davis)

    IMAGE INFO

    Date Taken: 11.24.2024
    Date Posted: 12.06.2024 10:46
    Photo ID: 8784863
    VIRIN: 241125-A-US975-1105
    Resolution: 6828x4552
    Size: 8.24 MB
    Location: FLORENCE, ALABAMA, US

    Web Views: 21
    Downloads: 1

    PUBLIC DOMAIN