Airmen from the 241st Air Traffic Control Squadron, 139th Airlift Wing, set up and maintain the newly-constructed TRN-50 Deployable Instrument Landing System (D-ILS) at Rosecrans Air National Guard Base, St. Joseph, Missouri, Nov. 7, 2024. The installation process for the D-ILS spans from October to January and will provide precise landing sites for low visiblity runways in deployed and local environments. (U.S. Air National Guard photo by Tech. Sgt. Audrey Chappell)
Date Taken: | 11.07.2024 |
Date Posted: | 12.06.2024 15:22 |
Photo ID: | 8785523 |
VIRIN: | 241107-Z-SP486-1161 |
Resolution: | 2050x1364 |
Size: | 569.1 KB |
Location: | ST. JOSEPH, MISSOURI, US |
Web Views: | 8 |
Downloads: | 1 |
This work, The 241st ATCS begins construction on mobile landing system [Image 9 of 9], by TSgt Audrey Chappell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.