The construction area for a new $28.08 million barracks building is shown Dec. 11, 2024, at Fort McCoy, Wis., as progress on the facility continues. The contractor for the project, BlindermanPower (Construction), received the notice to proceed with construction on Sept. 26, 2023, and has 780 calendar days to complete the project. The project requires building a four-story, 60,000-square-foot barracks about to house 400 people. Two other barracks of the same specifications have already been built in the same block at the installation since 2019. Overall, it is part of a big transformation taking place at the 1600 block that includes the building of four barracks — two of which are already done, three brigade headquarters buildings, and two planned transient training officer quarters, according to the Fort McCoy Directorate of Public Works. This project is managed by the Army Corps of Engineers and as of mid-September 2024 the project was 45 percent complete. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Date Taken: | 12.11.2024 |
Date Posted: | 12.16.2024 15:52 |
Photo ID: | 8803262 |
VIRIN: | 241211-A-OK556-9111 |
Resolution: | 5043x3362 |
Size: | 2.87 MB |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 1 |
Downloads: | 0 |
This work, December 2024 construction operations of Fort McCoy South Barracks Project [Image 10 of 10], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.