User frame fixture on a mockup part created by NUWC Division, Keyport Mechanical Engineer Keegan Webster at the Keyport Innovation Center for a cold spray repair project. (U.S. Navy photo by Keegan Webster/Released)
Date Taken: | 10.21.2024 |
Date Posted: | 01.14.2025 21:54 |
Photo ID: | 8830668 |
VIRIN: | 241021-N-VX206-1003 |
Resolution: | 5472x3648 |
Size: | 5.64 MB |
Location: | KEYPORT, WASHINGTON, US |
Web Views: | 61 |
Downloads: | 5 |
This work, Keyport Innovation Center helps engineer overcome project delay with 3D-printed mockups [Image 3 of 3], by Frank Kaminski, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.