A fire suppression system safe for both electronics and employees sits in a room inside the newly opened Premier Data Center during a tour at Ramstein AB, Germany, Jan. 15, 2025. A requirement in the new standard of operations here ensures everything has an extra system, allowing for maintenance while maintaining power and HVAC, and never endangering the reliability of equipment in the data center. (U.S. Air Force photo by Senior Airman Regan Enriquez)
Date Taken: | 01.15.2025 |
Date Posted: | 01.22.2025 11:45 |
Photo ID: | 8838474 |
VIRIN: | 250115-F-SL051-1098 |
Resolution: | 6048x4024 |
Size: | 870.64 KB |
Location: | RAMSTEIN AIR BASE, RHEINLAND-PFALZ, DE |
Web Views: | 6 |
Downloads: | 0 |
This work, Ramstein AB Premier Data Center reopens after renovation [Image 7 of 7], by SrA Regan Enriquez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.