A cold milling machine removes asphalt and concrete surfaces from the Ellsworth runway at Ellsworth Air Force Base, S.D., Jan. 31, 2025. This 10 month runway rehabilitation project spans over 13,000 feet, supporting the incoming B-21 Raider. (U.S. Air Force photo by Airman Addison Bolt)
Date Taken: | 01.31.2025 |
Date Posted: | 02.07.2025 17:08 |
Photo ID: | 8861835 |
VIRIN: | 250131-F-YQ382-1122 |
Resolution: | 7974x5316 |
Size: | 2.79 MB |
Location: | ELLSWORTH AIR FORCE BASE, SOUTH DAKOTA, US |
Web Views: | 17 |
Downloads: | 1 |
This work, Ellsworth AFB Runway Construction [Image 4 of 4], by Amn Addison Bolt, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.