Construction workers pour a concrete slab for the new 325th Logistics Readiness Squadron supply warehouse facility at Tyndall Air Force Base, Florida, Jan. 31, 2025.This 109,702-square-foot warehouse will have a total of three loading ramps, one of which is stand-alone. (U.S. Air Force photo by Senior Airman Zachary Nordheim)
Date Taken: | 01.31.2025 |
Date Posted: | 02.10.2025 10:29 |
Photo ID: | 8863778 |
VIRIN: | 250131-F-BE826-1074 |
Resolution: | 7301x4867 |
Size: | 14.3 MB |
Location: | TYNDALL AIR FORCE BASE, FLORIDA, US |
Web Views: | 8 |
Downloads: | 1 |
This work, Rebuild progress check: Tyndall CES/LRS complex [Image 10 of 10], by SrA Zachary Nordheim, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.