A U.S. Air Force MC-130J Commando II maintainer assigned to Air Force Special Operations Command checks tire pressure post-flight during Emerald Warrior 25.1, Arizona, Feb. 8, 2025. The post-mission process for maintenance begins on taxi with marshalling and doesn’t end until well after the aircrew have cleared out, including thorough inspection of aircraft components and reset for next flights. (U.S. Air Force photo by Senior Airman Rachel Pakenas)
Date Taken: | 02.08.2025 |
Date Posted: | 02.19.2025 15:30 |
Photo ID: | 8877228 |
VIRIN: | 250208-F-SC242-3713 |
Resolution: | 6048x4024 |
Size: | 17.89 MB |
Location: | US |
Web Views: | 3 |
Downloads: | 0 |
This work, Aircraft Maintenance: the team behind EW 25.1 [Image 10 of 10], by SrA Rachel Pakenas, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.