Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    647 CES ensures mission readiness through temperature control [Image 3 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    647 CES ensures mission readiness through temperature control

    JBPHH, HAWAII, UNITED STATES

    02.25.2025

    Photo by Staff Sgt. Alan Ricker 

    15th Wing

    U.S. Air Force Airman 1st Class Lorraine Tulee, 647th Civil Engineer Squadron heating, ventilation, air conditioning, and refrigeration technician, prepares an HVAC unit for a circuit board replacement at Joint Base Pearl Harbor-Hickam, Hawaii, Feb. 25, 2025. The team is responsible for Air Force units that are located throughout the installation, ensuring mission readiness by maintaining optimal temperatures for personnel and equipment. (U.S. Air Force photo by Staff Sgt. Alan Ricker)

    IMAGE INFO

    Date Taken: 02.25.2025
    Date Posted: 02.27.2025 18:56
    Photo ID: 8890204
    VIRIN: 250225-F-JA727-1079
    Resolution: 6048x4024
    Size: 3.1 MB
    Location: JBPHH, HAWAII, US

    Web Views: 41
    Downloads: 4

    PUBLIC DOMAIN