Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Missouri River Update - March 2025 [Image 1 of 2]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Missouri River Update - March 2025

    OMAHA, NEBRASKA, UNITED STATES

    03.06.2025

    Photo by Eileen Williamson 

    U.S. Army Corps of Engineers, Northwestern Division

    MISSOURI RIVER MAINSTEM RESERVOIR DATA Pool Elevation (feet above mean sea level) On February 28 Change in February Water in Storage (1,000 acre-feet) On February 28 % of 1967-2024 Average Change in February Fort Peck 2226.6 +0.7 13,294 92 +135 Garrison 1830.4 -2.5 15,638 88 -718 Oahe 1598.8 +1.5 16,132 91 +426 Big Bend 1420.5 -0.1 1,654 97 -9 Fort Randall 1350.2 +5.2 3,017 91 +376 Gavins Point 1206.8 -0.4 345 89 -10 Total 50,080 91 +200 WATER RELEASES AND ENERGY GENERATION FOR FEBRUARY Average Release in 1,000 cfs Releases in 1,000 acre-feet Generation in Million kWh Fort Peck 5.5 308 48 Garrison 23.5 1,303 188 Oahe 16.5 917 131 Big Bend 17.0 944 53 Fort Randall 11.7 649 67 Gavins Point 13.9 773 38 Total 525

    IMAGE INFO

    Date Taken: 03.06.2025
    Date Posted: 03.06.2025 10:57
    Photo ID: 8901307
    VIRIN: 250306-A-RO090-9383
    Resolution: 1031x821
    Size: 177.06 KB
    Location: OMAHA, NEBRASKA, US

    Web Views: 6
    Downloads: 1

    PUBLIC DOMAIN