250227-N-SU884-3001 MCMURDO STATION, Antarctica (Feb 27, 2025) – Builder 1st Class Evan Lisano from Littleton Colo. (forward left) Briefs the crew on the Definable Feature of Work (DFOW) for placing 80-foot steel piles for the McMurdo Offload Infrastructure Project. NMCB-3 provides critical engineering and construction support to missions worldwide. With a legacy of excellence dating back to World War II, NMCB-3’s skilled builders and engineers continue to support scientific research in Antarctica by constructing and maintaining vital infrastructure that allows for groundbreaking studies in one of the most remote regions on the planet. (U.S. Navy photo by Construction Mechanic 2nd Class Benjamin Torres Mata
Date Taken: | 02.26.2025 |
Date Posted: | 03.13.2025 22:01 |
Photo ID: | 8909211 |
VIRIN: | 250227-N-SU884-3001 |
Resolution: | 8256x5504 |
Size: | 4.94 MB |
Location: | MCMURDO, AQ |
Web Views: | 5 |
Downloads: | 1 |
This work, NMCB 3 Det Antarctica DFOW [Image 4 of 4], by PO2 Benjamin Torres Mata, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.