U.S. Army Corps of Engineers personnel inspect erosion control measures at Marquez Charter Elementary School in Pacific Palisades, California, on March 12, 2025. USACE is leading Phase 2 of wildfire debris removal, ensuring environmental stability and community safety in coordination with FEMA and local partners. (U.S. Army Corps of Engineers photo by Travis England)
Date Taken: | 03.12.2025 |
Date Posted: | 03.14.2025 14:48 |
Photo ID: | 8914509 |
VIRIN: | 250312-A-XJ146-4601 |
Resolution: | 2048x1365 |
Size: | 2.44 MB |
Location: | PACIFIC PALISADES, CALIFORNIA, US |
Web Views: | 1 |
Downloads: | 0 |
This work, USACE Leaders Oversee Erosion Control at Marquez Elementary [Image 6 of 6], by Travis England, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.