Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    March 2025 barracks construction operations for South Barracks Project at Fort McCoy [Image 21 of 27]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    March 2025 barracks construction operations for South Barracks Project at Fort McCoy

    FORT MCCOY, WISCONSIN, UNITED STATES

    03.10.2025

    Courtesy Photo

    Fort McCoy Public Affairs Office           

    The construction area for a new $28.08 million barracks building is shown March 10, 2025, at Fort McCoy, Wis., as progress on the facility continues. The contractor for the project, BlindermanPower (Construction), received the notice to proceed with construction on Sept. 26, 2023, and has 780 calendar days to complete the project. The project requires building a four-story, 60,000-square-foot barracks about to house 400 people. Two other barracks of the same specifications have already been built in the same block at the installation since 2019. Overall, it is part of a big transformation taking place at the 1600 block that includes the building of four barracks — two of which are already done, three brigade headquarters buildings, and two planned transient training officer quarters, according to the Fort McCoy Directorate of Public Works. This project is managed by the Army Corps of Engineers and as of the beginning of March 2025 was more than 75 percent complete. (U.S. Army Photo by Ken Green/U.S. Army Corps of Engineers)

    IMAGE INFO

    Date Taken: 03.10.2025
    Date Posted: 03.16.2025 01:31
    Photo ID: 8918064
    VIRIN: 250310-A-A4608-1187
    Resolution: 1105x674
    Size: 100.07 KB
    Location: FORT MCCOY, WISCONSIN, US

    Web Views: 4
    Downloads: 0

    PUBLIC DOMAIN