Connor Estes, a geologist with the Dam Safety Section, reviews data from the MIDAS system installed at Rough River Dam in Falls of Rough, Kentucky from his workstation in the Louisville District March 13, 2025. All reservoirs in the Louisville District utilize MIDAS for instrumentation monitoring, but the unique automated collection system at Rough River now allows Dam Safety to monitor the health of the dam from the district office in real time.
Date Taken: | 03.13.2025 |
Date Posted: | 03.17.2025 12:11 |
Photo ID: | 8919931 |
VIRIN: | 250313-A-GI410-1003 |
Resolution: | 3000x2074 |
Size: | 1.15 MB |
Location: | KENTUCKY, US |
Web Views: | 9 |
Downloads: | 1 |
This work, New monitoring system at Rough River Dam streamlines data collection, enhances safety [Image 2 of 2], by Michael Maddox, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.