Newly planted trees and recently installed landscaping could be seen outside a warehouse nearing the end of construction on Marine Corps Base Camp Blaz in March.
Date Taken: | 03.12.2025 |
Date Posted: | 03.23.2025 23:22 |
Photo ID: | 8931071 |
VIRIN: | 250313-O-CM160-7107 |
Resolution: | 5307x3539 |
Size: | 2.16 MB |
Location: | GU |
Web Views: | 9 |
Downloads: | 0 |
This work, New Landscaping Outside a Warehouse Under Construction on Camp Blaz [Image 6 of 6], by Rachel Landers, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.