Ryan Randall and Rusty Stamann apply the wrap to the gate pintal casting. Permanent parts need to be manufactured and will be replaced later this year.
Date Taken: | 03.14.2025 |
Date Posted: | 04.07.2025 11:48 |
Photo ID: | 8957596 |
VIRIN: | 250314-O-JV047-5562 |
Resolution: | 1600x1200 |
Size: | 299.08 KB |
Location: | LOCKPORT, ILLINOIS, US |
Web Views: | 3 |
Downloads: | 0 |
This work, USACE maintenance crews make temporary repairs on Lockport Lock [Image 2 of 2], by Emily Helton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.