Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Maintenance inspection flight [Image 17 of 21]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Maintenance inspection flight

    (UNDISCLOSED LOCATION)

    02.07.2013

    Photo by Tech. Sgt. Edward Gyokeres 

    621st Contingency Response Wing

    U.S. Army contractors check ground clearance while winching a U.S. Army UH-60L Black Hawk helicopter into a C-5M Super Galaxy at an undisclosed staging base for shipment to Afghanistan, Feb. 7, 2013. The movement was part of a U.S. Transportation Command intermodal exchange of aircraft and equipment belonging to two U.S. Army Combat Aviation Brigades into and out of Afghanistan. (U.S. Air Force photo by Tech. Sgt. Parker Gyokeres)

    IMAGE INFO

    Date Taken: 02.07.2013
    Date Posted: 03.27.2013 13:36
    Photo ID: 896086
    VIRIN: 130207-F-CA540-093
    Resolution: 4256x2832
    Size: 5.81 MB
    Location: (UNDISCLOSED LOCATION)

    Web Views: 14
    Downloads: 20

    PUBLIC DOMAIN