Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Getting the MXS Ready for the F-35 Mission! [Image 3 of 3]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Getting the MXS Ready for the F-35 Mission!

    PANAMA CITY, FLORIDA, UNITED STATES

    03.20.2025

    Photo by christine walker 

    Air Force Installation and Mission Support Center

    The Maintenance Squadron Complex construction continues moving along at Tyndall Air Force Base, Florid a March 20,2025. The facility is designed to withstand winds in excess of 150/160 MPH and elevated to prevent flood water intrusion in the event of another catastrophic hurricane. The original MXS facility was severely damaged when Category 5 Hurricane Michael struck Tyndall AFB in 2018.(Photo Courtesy Christine Alombro Walker)

    IMAGE INFO

    Date Taken: 03.20.2025
    Date Posted: 04.10.2025 19:15
    Photo ID: 8961775
    VIRIN: 250408-F-QF062-1003
    Resolution: 6000x4000
    Size: 8.82 MB
    Location: PANAMA CITY, FLORIDA, US

    Web Views: 1
    Downloads: 0

    PUBLIC DOMAIN