Corpus Christi Army Depot has attained another milestone in modernization and preparedness with the addition of solar-powered EV charging stations.
Date Taken: | 04.06.2025 |
Date Posted: | 04.15.2025 17:40 |
Photo ID: | 8975807 |
VIRIN: | 250407-A-AK442-2285 |
Resolution: | 1744x1198 |
Size: | 2.15 MB |
Location: | CORPUS CHRISTI, TEXAS, US |
Web Views: | 4 |
Downloads: | 0 |
This work, CCAD HOLDS RIBBON CUTTING FOR ELECTRIC VEHICLE SOLAR CHARGING STATION [Image 2 of 2], by Ervey Martinez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.