Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Perimeter Wall Construction Project At Wyckoff/Eagle Harbor Begins April 18 [Image 1 of 3]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Perimeter Wall Construction Project At Wyckoff/Eagle Harbor Begins April 18

    SEATTLE, WASHINGTON, UNITED STATES

    03.05.2025

    Photo by Nicole Celestine 

    U.S. Army Corps of Engineers, Seattle District

    Photo of sheet pile wall facing Puget Sound and Seattle during low tide. The beach in front of the sheet pile wall is a sand cap that protects the Puget Sound from creosote contamination. The sheet pile wall is scheduled to be replaced by September 2026.

    IMAGE INFO

    Date Taken: 03.05.2025
    Date Posted: 04.18.2025 11:07
    Photo ID: 8981805
    VIRIN: 250305-A-VA654-9905
    Resolution: 1912x861
    Size: 448.11 KB
    Location: SEATTLE, WASHINGTON, US

    Web Views: 4
    Downloads: 0

    PUBLIC DOMAIN