Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Hoisting a new beginning [Image 4 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Hoisting a new beginning

    BAGHDAD, IRAQ

    05.09.2008

    Courtesy Photo

    Multi-National Division Baghdad

    As the sun begins to set; Soldiers rig a 14,000-pound T-wall barrier to a crane before it is placed along a 3.2 mile barrier wall along Al Quds street in Sadr City. The Soldiers of the 821st Horizontal Engineer Company from Summersville, W.Va., 769th Eng. Bn., 35th Eng. Bde. MND-B, are constructing the T-wall structure that separates the neighborhoods of Tharwa to the north, and Jamilla to the south. (U.S. Army photo/Sgt. Henry Bauer, 769th Eng. Bn., 35th Eng. Bde. MND-B)

    IMAGE INFO

    Date Taken: 05.09.2008
    Date Posted: 05.30.2008 11:30
    Photo ID: 91575
    VIRIN: 080530-O-9999X-004
    Resolution: 480x640
    Size: 84.88 KB
    Location: BAGHDAD, IQ

    Web Views: 182
    Downloads: 14

    PUBLIC DOMAIN