The New Horizons construction teams are training in Belize using a fast, stay-in-place concrete wall forming system. The exterior walls of three of the four classrooms under construction are using this system, which is faster to construct. Pictured, is the concrete wall forming system at the Trial Farm Government School construction site April 30, 2013. Civil engineers from both the U.S. and Belize are constructing various structures at schools throughout Belize as part of an exercise called New Horizons. Building these facilities will support further education for the children of the country and provide valuable training for U.S. and Belizean service members. (U.S. Air Force photo/Master Sgt. James Law)
Date Taken: | 04.30.2013 |
Date Posted: | 05.02.2013 17:41 |
Photo ID: | 921083 |
VIRIN: | 130430-F-YY323-002 |
Resolution: | 4288x2848 |
Size: | 5.07 MB |
Location: | BELIZE CITY, BZ |
Web Views: | 93 |
Downloads: | 4 |
This work, New Horizons team builds structures faster [Image 11 of 11], by MSgt James Law, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.