U.S. Marine Corps Sgt. Christopher Johnson, right, combat engineer squad leader from the Marine Wing Support Squadron 472, measures the length of the end of the roof in order to cut the proper size of roof decking for installation at the construction site of Ladyville Technical High School May 14, 2013. Civil Engineers from both the U.S. and Belize are constructing various structures at schools throughout Belize as part of an exercise called New Horizons. Building these facilities will support further education for the children of the country and provide valuable training for U.S. and Belizean service members. (U.S. Air Force photo/Capt. Holly Hess)
Date Taken: | 05.14.2013 |
Date Posted: | 05.24.2013 13:12 |
Photo ID: | 940122 |
VIRIN: | 130514-F-FO324-005 |
Resolution: | 3619x2585 |
Size: | 1.39 MB |
Location: | LADYVILLE, BZ |
Web Views: | 9 |
Downloads: | 2 |
This work, Construction progress at Ladyville Technical High School [Image 6 of 6], by Capt. Holly Hess, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.