Haitham Ali Kadhem cuts a ribbon to signify the reopening of the Baghdad Al Jadida swimming pool during its grand reopening on June 7.
Date Taken: | 06.07.2008 |
Date Posted: | 06.15.2008 16:18 |
Photo ID: | 94726 |
VIRIN: | 080615-A-0000R-002 |
Resolution: | 1750x1158 |
Size: | 493.92 KB |
Location: | RUSTAMIYAH, IQ |
Web Views: | 107 |
Downloads: | 22 |
This work, Baghdad al Jadida residents receive refurbished pool in time for summer [Image 3 of 3], by SSG Brian Lehnhardt, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.