After placing connecting concrete panels, the pier being repaired by Underwater Construction Team 2 on Ebeye Island in the Kwajalein Atoll is ready for concrete placement. (Photo By Petty Officer 2nd Class Michael Price)
Date Taken: | 06.16.2013 |
Date Posted: | 07.31.2013 17:18 |
Photo ID: | 985494 |
VIRIN: | 130616-N-ZZ999-005 |
Resolution: | 5184x3456 |
Size: | 7.46 MB |
Location: | EBEYE ISLAND, MH |
Web Views: | 233 |
Downloads: | 15 |
This work, Kwajalein pier repair [Image 11 of 11], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.