Maj. Gen. B. Bayarmagnai, deputy chief of general staff for the Mongolian Armed Forces, addresses local residents, members of the Mongolian media and multinational troops during a ribbon-cutting ceremony for the newly renovated Erdmiin Orgil School in Nalaikh district, Ulaanbaatar, Mongolia, Aug. 13. The project took place as part of exercise Khaan Quest 2013. Engineers from the U.S., Mongolia and Canada worked side-by-side to replace the roof, windows, front stairs and interior doors, "re-stucco" the exterior walls, apply emulsion and repaint the building. They also tore down a structurally unsound concrete awning at the main entrance and built a handicap-accessible ramp at the front of the school.
Date Taken: | 08.13.2013 |
Date Posted: | 08.15.2013 06:14 |
Photo ID: | 995851 |
VIRIN: | 130813-M-MG222-004 |
Resolution: | 4590x3282 |
Size: | 3.45 MB |
Location: | ULAANBAATAR, MN |
Web Views: | 24 |
Downloads: | 4 |
This work, Engineering and medical projects in Nalaikh come to a close [Image 5 of 5], by Ben Eberle, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.