Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Joint Base MDL commences weeklong Leading Edge program

    Joint Base MDL commences weeklong Leading Edge program

    Photo By Daniel Barney | U.S. Air Force Master Sgt. Tanya Nicolay, 87th Operational Medical Readiness Squadron...... read more read more

    JOINT BASE MCGUIRE-DIX-LAKEHURST, NEW JERSEY, UNITED STATES

    10.12.2022

    Story by Daniel Barney 

    Joint Base McGuire-Dix-Lakehurst

    Joint Base McGuire-Dix-Lakehurst kicked off the Leading Edge program through the week of October 3 - 7. The Leading Edge program was designed to prepare all service members in the ranks of E4 to E-6 with the basic foundations to further support joint base operations. During the program, students were required to work in small groups, comprehend and synthesize information presented to them, and created solutions to the capstone objectives provided. The required courses included into the program were the joint perspective panel, the damage control assessment course, and the capstone panel, just to name a few. The endgame for the Leading Edge program was to train selected service members with the necessary tools, knowledge, and resources to become future military leaders, in order to serve their nation moving forward.

    Story was originally posted to the Joint Base McGuire-Dix-Lakehurst website on Oct. 12, 2022, and may be found at https://www.jbmdl.jb.mil/News/Article/3185479/joint-base-mdl-commences-weeklong-leading-edge-program/

    NEWS INFO

    Date Taken: 10.12.2022
    Date Posted: 10.12.2022 14:26
    Story ID: 431123
    Location: JOINT BASE MCGUIRE-DIX-LAKEHURST, NEW JERSEY, US

    Web Views: 25
    Downloads: 0

    PUBLIC DOMAIN