Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Detroit District COVID-19 Response: TCF Center Alternate Care Facility

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    DETROIT, MICHIGAN, UNITED STATES

    04.10.2020

    Courtesy Video

    U.S. Army Corps of Engineers, Detroit District

    The U.S. Army Corps of Engineers, Detroit District, completed construction at Michigan’s first Alternate Care Facility at TCF Center in Detroit. The facility began accepting patients April 10, 2020.
    The TCF Center Alternate Care Facility is one of the first in the Nation to be turned over to the state. Construction included triage area, patient support services such as showers and toilets, staff changing areas and administrative space, a command center and pharmacy. The 350,000 square foot conversion of the convention center into a medical facility with 970 bed spaces across two floors for COVID-19 patients took nine days.

    VIDEO INFO

    Date Taken: 04.10.2020
    Date Posted: 05.27.2020 19:52
    Category: Video Productions
    Video ID: 754174
    VIRIN: 200410-A-CE999-001
    Filename: DOD_107831172
    Length: 00:01:32
    Location: DETROIT, MICHIGAN, US
    Hometown: DETROIT, MICHIGAN, US

    Video Analytics


    Downloads: 4
    High-Res. Downloads: 4

    PUBLIC DOMAIN