This video depicts ongoing modernization of Building 1-C at Tobyhanna Army Depot. Over $900M have been made at TYAD to posture the installation for future capability development, support Large Scale Combat Operations, as well as surge requirements.
Date Taken: | 11.30.2021 |
Date Posted: | 11.30.2021 15:10 |
Category: | B-Roll |
Video ID: | 823363 |
VIRIN: | 211130-A-TB732-0001 |
Filename: | DOD_108705710 |
Length: | 00:01:05 |
Location: | US |
Downloads: | 3 |
High-Res. Downloads: | 3 |
This work, Tobyhanna Army Depot Modernization, by Ryan Beilman, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.