Builder 2nd Class Christopher Farmer, assigned to Underwater Construction Team (UCT) Two, works with a member of the Timor-Leste Defense Force to place core material during construction of a rubble mound breakwater. Seabees from UCT Two are working with Timor-Leste's MPU, Australia's Defence Cooperation Program, the Timor-Leste Defense Force and Seabees from NMCB 3 to construct a rubble mound breakwater and floating small boat pier. The small boat pier will enhance the MPU's ability to launch and recover small boats. (Photo by Petty Officer 2nd Class Matt Dawson)
Date Taken: | 10.19.2013 |
Date Posted: | 10.31.2013 17:09 |
Photo ID: | 1044112 |
VIRIN: | 131019-N-ZZ999-001 |
Resolution: | 2592x1936 |
Size: | 1.61 MB |
Location: | DILI, TL |
Web Views: | 163 |
Downloads: | 9 |
This work, Breakwater construction in Timor-Leste [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.