The first 100 feet of a 250 feet rubble mound breakwater constructed by Seabees from Underwater Construction Team (UCT) Two. Seabee divers from UCT Two are working with Timor-Leste's MPU, Australia's Defence Cooperation Program, the Timor-Leste Defense Force and Seabees from NMCB 3 to construct a rubble mound breakwater and floating small boat pier. The small boat pier will enhance the MPU's ability to launch and recover small boats. (Photo by Petty Officer 2nd Class Matt Dawson)
Date Taken: | 10.28.2013 |
Date Posted: | 10.31.2013 17:11 |
Photo ID: | 1044113 |
VIRIN: | 131028-N-ZZ999-001 |
Resolution: | 1600x1200 |
Size: | 677.55 KB |
Location: | DILI, TL |
Web Views: | 210 |
Downloads: | 10 |
This work, Timor-Leste breakwater construction [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.