Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    D-M hosts 16.4 MW solar array ribbon cutting ceremony [Image 4 of 6]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    D-M hosts 16.4 MW solar array ribbon cutting ceremony

    TUCSON, ARIZONA, UNITED STATES

    02.13.2014

    Photo by Airman 1st Class Chris Massey 

    355th Wing

    David Hutchens, Tucson Electric Power president, speaks at the photovoltaic solar array ribbon cutting ceremony at Davis-Monthan Air Force Base, Ariz., Feb. 13, 2014. The Air Force is a significant part of our nations strategy to establish greater energy security and become more energy efficient through conservation and use of alternative energy sources. (U.S. Air Force Photo by Airman 1st Class Chris Massey/Released)

    IMAGE INFO

    Date Taken: 02.13.2014
    Date Posted: 02.14.2014 14:10
    Photo ID: 1167759
    VIRIN: 140213-F-ZT877-144
    Resolution: 3184x2120
    Size: 1.42 MB
    Location: TUCSON, ARIZONA, US

    Web Views: 27
    Downloads: 2

    PUBLIC DOMAIN