Alex Hinojosa, North American Development Bank deputy managing director, speaks at the photovoltaic solar array ribbon cutting ceremony at Davis-Monthan Air Force Base, Ariz., Feb. 13, 2014. The 16.4 megawatt solar array is the largest of its kind on any U.S. Department of Defense installation. (U.S. Air Force Photo by Airman 1st Class Chris Massey/Released)
Date Taken: | 02.13.2014 |
Date Posted: | 02.14.2014 14:11 |
Photo ID: | 1167760 |
VIRIN: | 140213-F-ZT877-185 |
Resolution: | 2120x3184 |
Size: | 985.52 KB |
Location: | TUCSON, ARIZONA, US |
Web Views: | 23 |
Downloads: | 2 |
This work, D-M hosts 16.4 MW solar array ribbon cutting ceremony [Image 6 of 6], by SSgt Chris Massey, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.