Evidence of cable damage from the 'Port Royal' response. DLNR was told by the USN that cables used were floated which should have prevented this type of damage. Note the steel cable thread marks evident in the damaged coral.
Date Taken: | 03.03.2009 |
Date Posted: | 04.03.2009 06:08 |
Photo ID: | 162388 |
VIRIN: | 090403-O-9999X-008 |
Resolution: | 2848x1602 |
Size: | 1.24 MB |
Location: | AT SEA |
Web Views: | 35 |
Downloads: | 4 |
This work, USN Port Royal vessel grounding injury site [Image 26 of 26], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.