The Greens Bayou Flood Damage Reduction Project includes approximately 3.7 miles of channel conveyance improvements from Cutten Road to Veterans Memorial Drive and approximately 108 acres of stormwater detention storage.
Date Taken: | 02.25.2015 |
Date Posted: | 02.25.2015 12:54 |
Photo ID: | 1785695 |
VIRIN: | 150225-A-AB123-002 |
Resolution: | 1036x717 |
Size: | 838.79 KB |
Location: | HOUSTON, TEXAS, US |
Web Views: | 27 |
Downloads: | 1 |
This work, Federal funding breathes life into Greens Bayou Flood Damage Reduction Project [Image 2 of 2], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.