160612-N-BL637-201 PACIFIC OCEAN (June 12, 2016) A MV-22B Osprey, from Marine Operational Test and Evaluation Squadron 1, prepares to lift off from the flight deck of the aircraft carrier USS Carl Vinson (CVN 70). The V-22 Osprey is being tested, evaluated and is slated to be planned replacement for the C-2Q Greyhound as the singular logistics platform on an aircraft carrier for future carrier on-board delivery operations. (U.S. Navy photo by Mass Communication Specialist 3rd Class Sean Castellano/Released)
Date Taken: | 06.12.2016 |
Date Posted: | 06.16.2016 00:03 |
Photo ID: | 2662776 |
VIRIN: | 160612-N-BL637-201 |
Resolution: | 6796x4854 |
Size: | 2.3 MB |
Location: |
Web Views: | 20 |
Downloads: | 19 |
This work, 160612-N-BL637-201 [Image 132 of 132], by Sean Castellano, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.