160616-N-YL257-013 PORTSMOUTH, Va. (June 16, 2016) Aviation Boatswain's Mate (Handling) Airman Berline London is fitted for a gas mask aboard the aircraft carrier USS George H.W. Bush (CVN 77). GHWB is undergoing a planned incremental availability period at Norfolk Naval Shipyard. (U.S. Navy photo by Mass Communication Specialist 3rd Class Christopher D. Gaines/Released)
Date Taken: | 06.16.2016 |
Date Posted: | 06.18.2016 00:12 |
Photo ID: | 2670053 |
VIRIN: | 160616-N-YL257-013 |
Resolution: | 3776x2512 |
Size: | 845.25 KB |
Location: | USS GEORGE H.W. BUSH, N/A, US |
Web Views: | 9 |
Downloads: | 14 |
This work, George H.W. Bush is undergoing a planned incremental availability period at Norfolk Naval Shipyard. [Image 181 of 181], by PO2 Christopher Gaines, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.